Beskrywing
Oorsig
4kW Must 2.56kWh Bundle (Must). Ons lys dit onder Rugsteunpakkette, met aflewering tot by jou plaas of werf. Vir krag tydens beurtkrag sonder om ’n kragopwekker aan te skakel.
- Handelsmerk
- Must
- Kategorie
- Rugsteunpakkette
- Gradering
- 4kW
- Kode
- SW-0212
- Betaling
- EFT op ’n e-posfaktuur
Vrae oor hierdie produk
Wat kos aflewering vir die 4kW Must 2.56kWh Bundle?
Dit is swaar of lank en gaan per padvrag op ’n palet. Aflewering in Suid-Afrika kos R685, of niks as jou bestelling R45 000 of meer is (tot 1 000 kg). Na Namibië en Botswana: R3 680. Na Zimbabwe en Mosambiek: R4 730.
Waarop moet ek let voor ek koop?
Tel die watt van alles wat saam moet loop en hoeveel uur per dag; dit bepaal die grootte van die omsetter en battery.
Hoe betaal ek?
Plaas jou bestelling aanlyn. Ons e-pos ’n faktuur en jy betaal per EFT; ons stuur sodra die betaling ontvang is. Vir 10 of meer eenhede kwoteer ons graag: e-pos info@veldkraft.co.za.
Produkbesonderhede
The 4kW Must 2.56kWh Bundle is a battery back-up package built around a 4 kW Must inverter with 2.56 kWh of battery storage.
Without panels, the battery charges from the grid when power is on and takes over automatically during load-shedding. Panels can be added later on most hybrid inverters. At 4 kW it suits a typical family home: lights, plugs, fridges, TV, Wi-Fi and a microwave, with careful use of the kettle. With about 80% of 2.56 kWh usable, a 1 kW evening load runs for roughly 2 hours before the battery needs a recharge (an estimate; real runtime depends on the load).
Key details
| Inverter brand | Must |
|---|---|
| Inverter output | 4 kW |
| Battery storage | 2.56 kWh |
| Package type | Back-up |
| SKU | SW-0212 |
Before you order
- Ask for the full component list: we send it with your quote so you can see exactly what is included and what installation material you still need.
- Tell us what has to stay on during an outage so we can confirm the inverter and battery size.
- Match the inverter to your supply: single phase for most homes, three phase for larger homes and businesses.
- Installation must be done by a registered electrician, who issues a Certificate of Compliance. Grid-connected systems also need municipal registration.
Delivered nationwide, with the delivery cost to your town shown at checkout before you pay.
Compare more solar packages and back-up packages, or build your own from inverters and batteries.
Specifications
| Inverter output | 4 kW |
|---|---|
| Battery storage | 2.56 kWh |


Resensies
Daar is nog geen resensies nie.